

POOL DESIGN TYPES
DREAM TO REALITY

WE HANDLE IT
FROM CONCEPT TO CONSTRUCTION
Every detail of your design is important and something we work with you to make perfect.
Once your design is finalized, we transition from concept to construction-ready planning. This phase focuses on engineering accuracy, structural integrity, and site-specific considerations to ensure your pool is not only beautiful, but buildable. From structure to tile work, all aspects need planned and developed to make the process run smoothly.



CREATIVE TALENT
MEET OUR NEW POOL DESIGNERS
Steven Sharpe
Founder / Head Designer
Joey Cholwa
Senior Designer


THE FULL PROCESS
THE CUSTOM INGROUND POOL BUILDING PROCESS
Thinking about building an inground pool in Florida? In this full walkthrough, we break down the entire pool construction process from start to finish, specifically for homeowners in Brevard County and the Space Coast.
Whether you just bought a home, are building new construction, or are planning a backyard upgrade, this video shows exactly what to expect when building a custom swimming pool in Florida in 2026—no guesswork, no surprises.
Frequently Asked Questions
We’re here to help answer any questions you might have when it comes to building your dream pool. Didn’t find an answer? Reach out to us for more help.
Why is 3D design important before building a pool?
3D design allows you to see and refine your pool before construction begins, reducing uncertainty and costly changes later. It helps align expectations, improves decision-making, and ensures the final build reflects your vision while accounting for real-world site conditions.
What happens during the engineering and planning phase?
We take your ideas and turn them into detailed plans. This includes design drawings, structural engineering (if needed), and preparing everything for permits so construction runs smoothly.
Does this include permitting or approvals?
Engineering and planning are developed to support permitting, but permitting requirements vary by location. We coordinate plans to meet local regulations and can guide you through the permitting process as needed.
When should I start the pool design process?
As early as possible. Starting ahead of your ideal build date allows time for design, permits, and scheduling — especially during busy seasons.
How much input do I have in the design?
A lot. This is a custom process — you’ll choose the layout, features, finishes, and overall look, and we refine the design together until it feels right.
Do I need to have everything decided before starting?
No. You just need a general vision and budget range. We’ll guide you through the details and help you make decisions along the way.
